TenderWatch

← Zurueck zur Uebersicht

L1 - Lot 1 a: DC part - capacity class 0.5-20 MWh | L2 - Lot 1 b: DC part - capacity class >= 20 MWh | L3 - Lot 2 a: AC-part - capacity class 0.5-20 MWh | L4 - Lot 2 b: AC-part - capacity class >= 20 MWh | L5 - Lot 3 a: Complete system - capacity class 0.5-20 MWh | L6 - Lot 3 b: Complete system - capacity class >= 20 MWh | L7 - Lot 4a: 2nd life - complete system - capacity class > 0,5 MWh | L8 - Lot 4b: 2nd life - complete system - capacity class > 5 MWh unknown

Auftraggeber
EnBW Energie Baden-Württemberg AG
Veroeffentlicht
05.02.2026
Frist
-
Art
qu-sy
Geschaetzter Wert
-
Land
DE
CPV-Codes
Batterien Wechselrichter
Quelle
ted_europa | Auf TED ansehen
Notice ID
83842-2026

Beschreibung

L1 - Lot 1 a: DC part - capacity class 0.5-20 MWh DC battery system incl. system BMS + housing (rack, container, etc.) + air conditioning + fire protection system + UL 38.3 UN ECE Manual of Tests and Criteria, chapter 38.3 (test protocol necessary), CE conformity, Compliance with new Battery Regulation (EU), DIN EN 62619 | L2 - Lot 1 b: DC part - capacity class >= 20 MWh DC battery system incl. system BMS + housing (rack, container, etc.) + air conditioning + fire protection system + UL 38.3 UN ECE Manual of Tests and Criteria, chapter 38.3 (test protocol necessary), CE conformity, Compliance with new Battery Regulation (EU), DIN EN 62619 | L3 - Lot 2 a: AC-part - capacity class 0.5-20 MWh AC system (inverter + transformer (MV) + switch gear) + EMS (control) + prototype cert. VDE-AR-N 4110 + 4120 + optional 4130 | L4 - Lot 2 b: AC-part - capacity class >= 20 MWh AC system (inverter + transformer (MV) + switch gear) + EMS (control) + prototype cert. VDE-AR-N 4110 + 4120 + optional 4130 | L5 - Lot 3 a: Complete system - capacity class 0.5-20 MWh incl. system BMS + enclosure (rack, container, etc.) + air conditioning + fire protection system + AC system (inverter + transformer (MV) + switchgear) + EMS (control system) + optional auxiliary power supply + prototype certification. VDE-AR-N 4110 + 4120 + optional 4130 + UL 38.3 UN ECE Manual of Tests and Criteria, chapter 38.3 (test protocol necessary), CE conformity, Compliance with new Battery Regulation (EU), DIN EN 62619 | L6 - Lot 3 b: Complete system - capacity class >= 20 MWh incl. system BMS + enclosure (rack, container, etc.) + air conditioning + fire protection system + AC system (inverter + transformer (MV) + switchgear) + EMS (control system) + optional auxiliary power supply + prototype certification. VDE-AR-N 4110 + 4120 + optional 4130 + UL 38.3 UN ECE Manual of Tests and Criteria, chapter 38.3 (test protocol necessary), CE conformity, Compliance with new Battery Regulation (EU), DIN EN 62619 | L7 - Lot 4a: 2nd life - complete system - capacity class > 0,5 MWh complete system + enclosure (rack, container, etc.) + air conditioning / cooling system + inverter + EMS (control system)? | L8 - Lot 4b: 2nd life - complete system - capacity class > 5 MWh complete system + enclosure (rack, container, etc.) + air conditioning / cooling system + inverter + EMS (control system)?